Tidewater / Husky Energy
Tidewater / Husky Energy
Project Dates: 2005 – 2023
Workforce Range: 6 – 35
Projects
Tidewater Midstream & Infrastructure Oil Refinery Prince George.
HDRD Brownfield terminations and testing. Installation testing and commissioning of HDRD main transformer. VFD Installations. Tank upgrades. DCS & charm cabinet upgrades.
Peak workforce: 25
HDRD Construction Power. Heat trace panel installation. Transformer installations. Heat trace Controller installations. Network installations.
Peak workforce: 6
Tidewater Midstream & Infrastructure Oil Refinery Prince George.
#2 Crude BMS/Air compressors. Canola co-processing project. Tank 50 upgrade. HDRD construction power.
Peak workforce: 15
Tank upgrades. Heat trace installations. Instrumentation and electrical support.
Peak workforce: 6
Husky Oil Refinery Prince George.
Crude debottleneck. Butane blending. Gas chromatograph. Site security gates.
Peak workforce: 15
Wastewater contract 3A – electrical and instrumentation installations.
Peak workforce: 30
Husky Energy
CWP LRU 014 – 015 – electrical installations.
Peak Workforce: 30
CWP electrical upgrade – Electrical installations.
Peak Workforce: 20
Husky Energy – Prince George Refinery
Plant electrical upgrade – replacement of medium voltage transformers, replacement of MCCs, and replacement of existing power & motor control conduit distribution systems.
Peak Workforce: 35
Husky Energy – Prince George Refinery
Power and controls and DCS upgrade for clean fuels upgrade project and general plant upgrades.
Peak Workforce: 10