Chemical and water Treatment

Equipment inside a gold mine

CLIENT

Canfor Pulp and Paper Ltd

Project Date: 2020 - 2021

Peak Workforce: 20

Canfor Raw Water Treatment Plant.

  • Installation of a 15 kV substation, transformers, and power distribution system.
  • Modifications to existing PG Pulp and Intercon water intake systems.
  • Underground works to integrate the existing water system to the new water treatment plant.
  • Install new electrical e-house to accommodate MCC, PLC and network equipment.
  • Provided all building services. 
  • Supplied and installed new cable trays, cables, and field terminal boxes.
  • Electrical and instrumentation installations for a complete water treatment system.
  • Assisted with commissioning before turnover to operations.
Husky-Tray-Bridge

CLIENT

Chemtrade Logistics

Project Dates: 2012 - 2018

Click the button below to see a detailed list of our work. 

Equipment inside a gold mine

CLIENT

Baymag Inc.

Project Date: 2008 - 2009

Peak Workforce: 20

Baymag Plant II – Calcining facility phase 2A.

Installation of electrical and instrumentation for new facility.