PROJECTS

Mining

Husky-Tray-Bridge

CLIENT

Conuma Resources

Project Dates: 2023 - current

Click the button below to view a detailed list of our work with Conuma Coal Mines. 

Equipment inside a gold mine

CLIENT

Newmont

Project Date: 2017 - current

Click the botton below to view a detailed list of our projects with Newmont.

Equipment inside a gold mine

CLIENT

Ascot Resources

Project Date: 2021 - current

Peak Workforce: 50

Premier Gold Mine –  Installation of new electrical services for plant-wide distribution. 

Installation of new 13.8 kV electrical services for plant wide distribution.  Electrical installation of 600V distribution, backup generator, ball mill, sag mill, complete new electrical and instrumentation for the process plant, administration area, water treatment, heat tracing.

Equipment inside a gold mine

CLIENT

Lenmark

Project Date: 2022 - 2023

Peak Workforce: 8

Snap Lake Diamond Mine –  Decommission of electrical equipment.

General decommissioning and labeling of equipment for repurpose at new locations. Generators, switch gear, transformers and more. Included mechanical, electrical, and logistics requirements.

Husky-Tray-Bridge

CLIENT

DeBeers Group

Project Dates: 2015 - 2023

Click the button below to view a detailed list of our work with the DeBeers Group’s Gaucho Kue Diamond Mine. 

Husky-Tray-Bridge

CLIENT

Newcrest Mining Limited

Project Dates: 2019 - 2023

Click the button below to view a detailed list of our work with Newcrest Red Chris Mining. 

Husky-Tray-Bridge

CLIENT

Centerra Gold

Project Dates: 2019 - 2023

Click the button below to view a detailed list of our work with Centerra Gold.  

Equipment inside a gold mine

CLIENT

Conuma Brute Mine

Project Date: 2022

Peak Workforce: 6

Electrical maintenance coverage. BCR ponds. Water treatment expansion.

Equipment inside a gold mine

CLIENT

Barrick Gold

Project Date: 2022

Peak Workforce: 4

PLC Upgrades – Remove and replace the current PLC hardware. Assist with commissioning and start-up. Build new fiber and wireless backbone.

Husky-Tray-Bridge

CLIENT

JDS Energy and Mining

Project Dates: 2018 - 2021

Click the button below to view a detailed list of our work with JDS Mining. 

Husky-Tray-Bridge

CLIENT

Bighorn Mining

Project Dates: 2018 - 2020

Click the button below to view a detailed list of our work with Bighorn Mining. 

Husky-Tray-Bridge

CLIENT

Thompson Creek Metals

Project Dates: 2012 - 2019

Click the button below to view a detailed list of our work with Thompson Creek Metals. 

Equipment inside a gold mine

CLIENT

Nyrstar

Project Date: 2018

Peak Workforce: 15

Myra Falls Mine – Instrumentation installation, calibration, and commissioning support for the restart of the Myra Falls Mine lead, copper, and silver mine.

Equipment inside a gold mine

CLIENT

TMAC Resources Inc.

Project Date: 2016 - 2017

Peak Workforce: 70

Hope Bay Mine – Installation of gold and copper mine.

Equipment inside a gold mine

CLIENT

Gibraltar Mine Ltd.

Project Date: 2012 - 2013

Peak Workforce: 80

Mine process expansion includes site-wide fiber optic infrastructure; and electrical and instrumentation installation of new molybdenum plant and brownfield areas.

Husky-Tray-Bridge

CLIENT

The Gisborne Group

Project Dates: 2011 - 2013

Click the button below to view a detailed list of our work with The Gisborne Group. 

Husky-Tray-Bridge

CLIENT

Johnson Controls

Project Dates: 2011 - 2012

Click the button below to see a detailed list of our work with Johnson Controls. 

Equipment inside a gold mine

CLIENT

Walter Energy / Western Coal

Project Date: 2011 - 2012

Peak Workforce: 12

Brule Mine – Truck shop and administration facility; site-wide electrical and instrumentation installation.

Equipment inside a gold mine

CLIENT

Roberts & Schaefer Company

Project Date: 2011 - 2012

Peak Workforce: 28

Elkview Mine  – Heavy media coal processing facility – electrical and instrumentation installation.

Equipment inside a gold mine

CLIENT

Taggart Global

Project Date: 2011 - 2012

Peak Workforce: 25

Willow Creek Minesite  – Refuse conveyor, raw coal system and lighting supply, wash plant extension. 

Equipment inside a gold mine

CLIENT

Similco Mines

Project Date: 2011

Peak Workforce:12

Copper Mountain Mining – Installation of freshwater reclaim system, commissioning, and start-up.

 

Equipment inside a gold mine

CLIENT

Yukon Zinc Corporation

Project Date: 2009 - 2011

Peak Workforce: 95

Wolverine Mine – Installation of new crusher building, new mill building and truck shop, plant wide fire alarm and power generation.

Complete instrumentation installation including calibration, commissioning, startup assistance, maintenance, and consulting services.

Husky-Tray-Bridge

CLIENT

Western Canadian Coal

Project Dates: 2005 - 2008

Click the button below to view a detailed list of our work with Western Canadian Coal.

Husky-Tray-Bridge

CLIENT

International Quest Engineering Ltd.

Project Dates: 2004 - 2008

Click the button below to view a detailed list of our work with International Quest Engineering Ltd.