Enbridge / Westcoast Energy

ENBRIDGE / Westcoast Energy

For almost 20 years we have worked with Enbridge/Westcoast Energy on various projects at various locations. 

Project Dates: 2005 – 2023

Workforce Range: 6 – 30 

Projects

CS-4A Unit Control Upgrade-CS-6A TSRE Demolition upgrade and assorted projects-CS8B Emergency generator upgrade and unit skid upgrade.

Removed and replaced the existing MCC’s, demo of existing obsolete equipment, Installation, and commissioning of required electrical and Instrumentation equipment, installation of underground services, power poles and service transformers. Instrumentation upgrades including tubing, new instrument install testing and commissioning.

Peak workforce: 20

CS-6A station Demo.  CS-4A station UCP-3 control panel replacement.

Peak workforce: 15

CS-4B/5 TSRE Demo and barrel bypass- Demo of obsolete equipment at CS-8B and building upgrade.

Removed and replaced the existing MCC’s, demo of existing obsolete equipment, Installation and commissioning of required electrical and Instrumentation equipment, installation of underground services, power poles and service transformers.

Peak workforce: 30

Hardwire Logic Integration projects at CS-4A, CS-4B, CS-5.  Enbridge CS-8B station emergency generator install and Unit fuel skid replacement.

Peak workforce: 25

CS-4B Station PLC Upgrade- 4BL1 Crossover/Cathodic Installation.

CS-4B General for Genius block upgrade. Looked after site prep and construction services. Fiber optic terminating and testing, control upgrade and commissioning. Station 4B-L1. Looked after grounding, cad welds, and electrical fence grounding test point commissioning.

Peak Workforce: 8

Compressor Station PLC I/O Upgrade and various station projects – CS8B.

Peak workforce: 15

Compressor Station PLC I/O Upgrade and various station projects – CS6A.

Peak workforce: 12

Summitt Lake electrical and instrumentation installation for boiler replacement.

Peak workforce: 6

Load bank – electrical and instrumentation installations.

Peak workforce: 10

Various compressor stations and processing within B.C. 

Power and control upgrades.

Peak workforce: 12

Various compressor stations and processing within B.C. 

Power and control upgrades.

Peak workforce: 7