Tidewater Midstream & Infrastructure Oil Refinery Prince George.

HDRD Brownfield terminations and testing. Installation testing and commissioning of HDRD main transformer. VFD Installations. Tank upgrades. DCS & charm cabinet upgrades.

Peak workforce: 25

HDRD Construction Power.  Heat trace panel installation. Transformer installations. Heat trace Controller installations.  Network installations.

Peak workforce: 6

Tidewater Midstream & Infrastructure Oil Refinery Prince George.

#2 Crude BMS/Air compressors.  Canola co-processing project.  Tank 50 upgrade. HDRD construction power.

Peak workforce: 15

Tank upgrades. Heat trace installations. Instrumentation and electrical support.

Peak workforce: 6

Husky Oil Refinery Prince George.

Crude debottleneck. Butane blending. Gas chromatograph.  Site security gates.

Peak workforce: 15

Wastewater contract 3A – electrical and instrumentation installations.

Peak workforce: 30

Husky Energy

CWP LRU 014 – 015 – electrical installations.

Peak Workforce: 30

CWP electrical upgrade – Electrical installations.

Peak Workforce: 20

Husky Energy – Prince George Refinery

Plant electrical upgrade – replacement of medium voltage transformers, replacement of MCCs, and replacement of existing power & motor control conduit distribution systems.

Peak Workforce: 35

Husky Energy – Prince George Refinery

Power and controls and DCS upgrade for clean fuels upgrade project and general plant upgrades.

Peak Workforce: 10