PROJECTS

Power Generation and Distribution

Equipment inside a gold mine

CLIENT

Nuna Logistics

Project Date: 2023 - current

Peak Workforce: 4

Nuna logistics snap lake water treatment and care and maintenance.

Removed and replaced the existing MCC’s, demo of existing obsolete equipment, Installation and commissioning of required electrical and instrumentation equipment, installation of underground services, power poles, and service transformers.

Equipment inside a gold mine

CLIENT

The Gisborne Group

Project Date: 2014 - 2015

Peak Workforce: 5

BC Hydro bridge river power project. Cooling water upgrade – electrical and instrumentation installations.

Equipment inside a gold mine

CLIENT

International Quest Engineering Ltd.

Project Date: 2014 - 2015

Peak Workforce: 10

Genalta power inc. Genset Installation – Phase 1 & 2 – electrical and instrumentation installations

Equipment inside a gold mine

CLIENT

Dowland Industrial Works Ltd.

Project Date: 2012

Peak Workforce: 6

Dasque cluster hydroelectric project – electrical installations.

Equipment inside a gold mine

CLIENT

Eaton Corporation

Project Date: 2012

Peak Workforce: 5

Middle and Dasque creek hydroelectric.

Powerhouses, substations, and intake buildings – electrical and instrumentation installations.

Equipment inside a gold mine

CLIENT

Kamtech Services

Project Date: 2010 - 2011

Peak Workforce: 4

BC Hyrdo – Aberfeldie Dam Site.

Assist BC Hydro personnel with modifications to generator high voltage terminations.

Equipment inside a gold mine

CLIENT

Earth First

Project Date: 2008 - 2010

Peak Workforce: 10

Dokie Wind Farm Project.

Installation of substation and wind farm towers and bases.

Equipment inside a gold mine

CLIENT

Mutual Construction (2000) Ltd.

Project Date: 2008

Peak Workforce: 5

BC Hyrdo – Williston sub station.

Modifications to 500 kV switches and installation of new 500 kV breakers.